DFAR 252.246-7000 - Material Inspection and Receiving Report
Started by KR_2016 · Mar 29, 2023 · 4 replies
- KOriginal post
KR_2016
Mar 29, 2023 · 3y ago
Greetings,
I am hoping someone can give some clarification on DFAR Clause 252.246-7000 Material Inspection and Receiving Report. If the contract does not contain 252.246.7000 does that exempt the Prime Contractor from needing to obtain a DD250 for the delivery of separate and distinct objects to the Gov’t?
Any insight would be most appreciated.
- V
Vern Edwards
Mar 29, 2023 · 3y ago
Is it an old contract, because DFARS 252.246-7000 no longer exists. Have you read DFARS Appendix F? If not, read it, and then come back if you still have a question.
- D
Don Mansfield
Mar 30, 2023 · 3y ago
KR_2016 said:
Greetings,
I am hoping someone can give some clarification on DFAR Clause 252.246-7000 Material Inspection and Receiving Report. If the contract does not contain 252.246.7000 does that exempt the Prime Contractor from needing to obtain a DD250 for the delivery of separate and distinct objects to the Gov’t?
Any insight would be most appreciated.
Does the contract contain DFARS 252.232-7003? If so, the WAWF Receiving Report is the electronic equivalent of the DD 250.
- K
KR_2016
Apr 5, 2023 · 3y ago
Thank you, Vern and Don, for replying to my question. I was unaware that 252.246-7000 no longer existed, and have since read DFAR Appendix F. My issue is now resolved.
- D
Don Mansfield
Apr 7, 2023 · 3y ago
On 4/5/2023 at 1:14 PM, KR_2016 said:
Thank you, Vern and Don, for replying to my question. I was unaware that 252.246-7000 no longer existed, and have since read DFAR Appendix F. My issue is now resolved.
👍