CCPD for an under-SAT Modification of IDIQ contract for which CCPD was required for the Base
Started by LearnMeAContract · Aug 31, 2020 · 1 replies
- LOriginal post
LearnMeAContract
Aug 31, 2020 · 5y ago
Is CCPD required for a modification that is increasing the value (by less than SAT) of a multi-million dollar IDIQ contract that already exceeded the TINA threshold and was required CCPD at the time of the Base Award? Note: Not a commercially available item.
hypothetical example:
- Base Award Contract Value was $5M
- CCPD was obtained for it at that time.
- Mod is for $65K increase.
- Total Contract value after mod award would be $5,065,000.
- Base Award Contract Value was $5M
- D
Don Mansfield
Aug 31, 2020 · 5y ago
The contracting officer would actually be prohibited by FAR 15.403-1(a) from obtaining CCPD. This assumes that the mod is only for an increase--not a net increase after addition and subtraction.